
KONYA Metropolitan Municipality Parks and Gardens Directorate

BROKEN GLASS AND SAND STOCK SILOS

Seyitömer Thermal Power Plant at +65 Level SEÖS Platform, Stair Maintenance and Chimney Paint Renewal.

Steel Construction Ladder and Platform Manufacturing and Erection for CEMS.

All electrical, steel construction and construction works planned for Factory Chimney SEÖS.

CEMS WORKS

Steel Construction Hangar Manufacturing and Erection to Construction Seydişehir Road Construction Site

CEMS Platform and Chimney Ladder Manufacturing and Installation.

Coke Coal Stock Silos

120 Meters Flue Turnkey (TEAM)

Steel construction manufacturing and assembly was carried out for Crushers and belts at Açılım İnşaat Road Construction Sites.

275 Meters Chimney Construction.

2000 M2 Steel Conc. Construction of Closed Fire Brigade and Turnkey (COMMITMENT)

TurnKey

10.000 Ton Stock Silo MİMAG (Subcontractor)

3500 M2 Covered Market Place (SUBCONTRACTOR)

4 Pieces 120 meters Chimney Repair (Subcontractor)

Steam Boilers Refractory Applications (Subcontractor)

L.N.G Tanks Foamglass Insulation 10.000 M2 (COMMITMENT)

New Refractory Fabrication of Crystallized Furnaces (COMMITMENT)

Construction of 10.000 M2 Closed Marketplace

Construction of a Closed Animal Market and Sacrifice Slaughter Center

5 pieces of B.A. Silo Manufacturing

120 MT Chimney Turnkey (COMMITMENT)

Refractory Renovation Work of ALÜMUNA Rotary Kilns (COMMITMENT)

2 Pieces 60 Meter Steel Chimney Renovation (COMMITMENT)

Insulation Work of Cyclones (Subcontractor)

Steel CONST. of Cafeteria and Administration Buildings. Roof Construction

WATCHTOWER (COMMITMENT)
RC Line Compensator was manufactured and assembled.

CEMS WORKS

120 MT Chimney Turnkey (COMMITMENT)

Degazör Maintenance Works Belonging to E.Ü.A.Ş.

Two Tank Tire Coating work Belonging to E.Ü.A.Ş.

Mill Maintenance works Belonging to E.Ü.A.Ş.

Maintenance and Repair of Some Stairs and Railings Belonging to E.Ü.A.Ş.

For 12 mills, the shipment line was changed and 10 expanded assemblies were made.

Reactor maintenance of 3 different units was done.

Soma 600 Ton TH Rebar Straightening Presses Have Been Maintained.
Steel Construction Minaret Manufacturing and Installation for Ketenli Mosque

Special design steel construction modular staircase work was carried out for CEMS works.

Improvement of POPs Batteries, Chimneys, Aircraft Warning Warning Lights and Lightning Rod System.

Steel Construction Cattle Livestock Farm was manufactured and assembled.

Istanbul İSKİ Steel Construction and Sample Tracking Bridge Over Rivers Manufacturing and Installation work has been completed.

Construction of a ladder to the boiler chimney in accordance with the Communiqué on Continuous Emission Measurement Systems.

Manufacturing and assembly of walkable roof with collapsible rails, hydraulic freight elevators, steel construction warehouses were made for Konya.

Beyşehir Hüyük Mosque Dome Manufacturing, thermal insulation and liquid insulation works.
The historical house belonging to Hacı Mehmet Ali Arslan, from Seydişehirli Gazneferler Dynasty, was restored.
Dish Assembly JAPANESE N.E.C. On behalf of the Company (EKIP)
On Behalf of TEKFEN CONSTRUCTION (TEAM)
Central System Heating Building Chimney 100 Meters
Stock Silos and Mill Assembly
500 Flats On Behalf of EKİNCİLER CONSTRUCTION (TEAM)
5000 Flats Tunnel Formwork, Tower Crane on behalf of EKİNCİLER CONSTRUCTION. (TEAM)
106 Duplex Ismil Spa House (BUİLDİNG SİTE)
12 TRIPLEX VILLAS (COMMITMENT)
Steel Conc. 30 M. Spacing Truss Column and Coating (SUBCONTRACTOR)
Şekerpen FAB. Almetal Aluminum FAB. Seytex Tekstil FAB. Call Model DEPOT. Gonenc Aluminum FAB. Annorm Aluminum FAB. Turker Aluminum FAB. Steel Construction Factory Buildings and coating work (COMMITMENT)
FRUIT JUICE FACTORY (SUBCONTRACTING)
Lighting, Walkway1500 MT. And Recreation Facilities (COMMITMENT)
Summit Recreation Facilities (COMMITMENT)
ADDITIONAL STEEL FACILITY (SUBCONTRACTOR)
Steel Wheat Silos (Subcontractor)
Tower Crane Assembly and Disassembly and Assembly of POTAİN, LİEBHERR, EDİLGRU, CADILLON, SIMMA, COMEDİL, ÇİMTAŞKAYZER, FMGRU, Brand Tower Cranes.
Coal Removal Belt Legs; Reinforced Concrete and Steel CONS. Reinforcement Process. (COMMITMENT)
Sandblasting and Epoxy Chemical Coating of Main Cooling Water Concrete and Steel Pipelines (COMMITMENT)
4th and 5th Units Floactor Pool Around Epoxy Chemical Repair Work and Construction Work of Heating Installation on the Carrier PASAVANT Road (TAAAHHÜT)
4 and 5 Units Chimney Repairs Complete (INSULATED - FIRE BRICK AND CONCRETE) Aircraft Warning Systems, Lightning Rod, Steel Const. Epoxy Repairs, Epoxy Painting. Turnkey Transaction with Materials (SUBCONTRACTOR)
Cooling Tower CTP Coating
Complete Maintenance and Repair of Flakulators (COMMITMENT)
2 Pieces 120 MT Chimney Maintenance and Repair (COMMITMENT)
Maintenance, Repair and Periodic Controls of All Cranes from 1 Ton to 150 Tons (COMMITMENT)
Conversion of Coal Bunker Sliders to a Complete Hydraulic System (COMMITMENT)
Sandblasting and Epoxy Coating of All Forced Drawing Pipes (COMMITMENT)
Renovation of Boiler Roofs (COMMITMENT)
ÇATALAĞZI TS Slag Crushing Press Manufacturing and Installation
SEYITÖMER TS Cooling Towers GRP Panel Replacement
Establishment of SEYITÖMER TS Chemical Water Treatment Plant
SEYITÖMER TS Turbine Crane Maintenance and Repair
SEYITÖMER TS Forced Drawing Pipes Sandblasting and Epoxy Coating Work
ORHANELİ TS Slag Trough Conversion of Hydraulic Auto Chain Tensioning and Boiler Pulling to Hydraulic System
ORHANELİ TS 10 TON 60 MT 2 Piece Crane Manufacturing and Installation
Conversion of ORHANELİ TS Boiler Burner Nozzles to Hydraulic System
Conversion of ORHANELİ TS Coal Bunker Bolts from Mechanical System to Electronic and Hydraulic System
All Rough Constructions and Turnkey Completed
Coal Coils and Gas Channels; Reinforced Concrete, Steel, Heat Resistant Concrete and 3 Pieces 70 Meters Tunnel Construction (Subcontractor)
Rail Missile Ramp Concrete Mold was manufactured.
Renovation of SEYITÖMER TS Boiler Roof and Facade Cladding
Clinker Stock Silo Construction Completed.
Clinker Stock Silo Construction Completed.
Steel Construction works for the Design, Project, Manufacturing and Assembly of the 1st and 2nd Unit Chimneys in accordance with SEÖS communiqué. Including Special Design Z ladder Manufacturing and Erection, Balcony reinforcement, Horizontal and Vertical Life Lines, Ground Crane with Guidance, SEÖS Platforms, Lighting, SEÖS Holes and Electrical works.
DFRP-6P Cooling Tower job for Iraq.
Sliding mold manufacturing works for the minaret and dome of the Istanbul Taksim Mosque Project.
Metrogros Markets; Steel CONS. Reinforcements, Reinforced Concrete Reinforcements with Epoxy and Chemicals AND Reinforcement of Prafabricated Columns with Steel Ropes. (COMMITMENT)
Coal Coils and Gas Channels; Reinforced Concrete, Steel, Heat Resistant Concrete and 3 Pieces 70 Meters Tunnel Construction (Subcontractor)
Turnkey cement plant, slip formwork and other construction works have been completed.
The CTS Chimney in Konya Seydişehir Eti Aluminum Facilities was completely painted and the steel construction ETİ lettering was manufactured and assembled.
15.000 TONS Silo Sliding mold works, electrolysis room distribution and modernization construction and steel construction manufacturing and assembly works in Konya Seydişehir Eti Aluminum Facilities have been completed.