Our References

Konya-Buyuksehir-Belediyesi-Logo
KONYA BÜYÜKŞEHİR BELEDİYESİ

KONYA Metropolitan Municipality Parks and Gardens Directorate

Sise-Cam-Sanayi-Logo
TOPKAPI BOTTLE GLASS IND.

BROKEN GLASS AND SAND STOCK SILOS

Celikler-Holding-Logo
Çelikler Holding

Seyitömer Thermal Power Plant at +65 Level SEÖS Platform, Stair Maintenance and Chimney Paint Renewal.

Anadoolu-Etap-Logo
AEP Anadolu Etap

Steel Construction Ladder and Platform Manufacturing and Erection for CEMS.

petlas-logo
Petlas Kırşehir Factory

All electrical, steel construction and construction works planned for Factory Chimney SEÖS.

Kayseri-Seker-Turhal-Logo
TURHAL SUGAR FACTORY

CEMS WORKS

Seza-İnsaat-Logo
Seza Build

Steel Construction Hangar Manufacturing and Erection to Construction Seydişehir Road Construction Site

Aksa-Enerji-Logo
AKSA Göynük Energy Generation Inc.

CEMS Platform and Chimney Ladder Manufacturing and Installation.

Erdemir-Logo
Eregli Iron and Steel Factory.

Coke Coal Stock Silos

Catalagzi-termik-Santrali-Logo
EÜAŞ ÇATALAĞZI THERMAL POWER PLANT OPERATION. MD.

120 Meters Flue Turnkey (TEAM)

Seza-İnsaat-Logo
Seza Build

Steel construction manufacturing and assembly was carried out for Crushers and belts at Açılım İnşaat Road Construction Sites.

Soma-Termik-Santrali-Logo
SOMA-B THERMAL POWER PLANT

275 Meters Chimney Construction.

Seydisehir-Belediyesi-Logo
SEYDİŞEHİR BELEDİYESİ

2000 M2 Steel Conc. Construction of Closed Fire Brigade and Turnkey (COMMITMENT)

Kırıkkale-Ankara-Yem-Fabrikası
KIRIKKALE ANKARA FEED FACTORY

TurnKey

Konya-Cimento-Logo
KONYA CEMENT

10.000 Ton Stock Silo MİMAG (Subcontractor)

Aksehir-Belediyesi-Logo
AKŞEHİR BELEDİYESİ

3500 M2 Covered Market Place (SUBCONTRACTOR)

ALİAĞA PETKİM

4 Pieces 120 meters Chimney Repair (Subcontractor)

ALİAĞA PETKİM

Steam Boilers Refractory Applications (Subcontractor)

ALİAĞA

L.N.G Tanks Foamglass Insulation 10.000 M2 (COMMITMENT)

Bal-Kupu-Kup-Seker-Logo
AKSARAY BALKUP SUGAR FACTORY

New Refractory Fabrication of Crystallized Furnaces (COMMITMENT)

Seydisehir-Belediyesi-Logo
SEYDİŞEHİR BELEDİYESİ

Construction of 10.000 M2 Closed Marketplace

Seydisehir-Belediyesi-Logo
SEYDİŞEHİR BELEDİYESi

Construction of a Closed Animal Market and Sacrifice Slaughter Center

Kipas-Kagit-Logo
ADANA KIPAS PAPER

5 pieces of B.A. Silo Manufacturing

Polat-Enerji-Logo
POLAT ENERGY

120 MT Chimney Turnkey (COMMITMENT)

Eti-Alüminyum-Logo
SEYDİŞEHİR ETİ ALUMINUM INC.

Refractory Renovation Work of ALÜMUNA Rotary Kilns (COMMITMENT)

Eti-Alüminyum-Logo
SEYDİŞEHİR ETİ ALUMINUM INC.

2 Pieces 60 Meter Steel Chimney Renovation (COMMITMENT)

Eti-Alüminyum-Logo
SEYDİŞEHİR ETİ ALUMINUM INC.

Insulation Work of Cyclones (Subcontractor)

Eti-Alüminyum-Logo
SEYDİŞEHİR ETİ ALUMINUM INC.

Steel CONST. of Cafeteria and Administration Buildings. Roof Construction

Konya-Bilim-Merkezi-Logo
KONYA SCIENCE CENTER

WATCHTOWER (COMMITMENT)

ÇATES Electricity Generation Inc.

RC Line Compensator was manufactured and assembled.

Turkseker-Logo
SUSURLUK SUGAR FACTORY

CEMS WORKS

Polat-Enerji-Logo
POLAT ENERGY

120 MT Chimney Turnkey (COMMITMENT)

Soma-Termik-Santrali-Logo
SOMA THERMAL POWER PLANT

Degazör Maintenance Works Belonging to E.Ü.A.Ş.

Soma-Termik-Santrali-Logo
SOMA THERMAL POWER PLANT

Two Tank Tire Coating work Belonging to E.Ü.A.Ş.

Soma-Termik-Santrali-Logo
SOMA THERMAL POWER PLANT

Mill Maintenance works Belonging to E.Ü.A.Ş.

Soma-Termik-Santrali-Logo
SOMA THERMAL POWER PLANT

Maintenance and Repair of Some Stairs and Railings Belonging to E.Ü.A.Ş.

Soma-Termik-Santrali-Logo
SOMA THERMAL POWER PLANT

For 12 mills, the shipment line was changed and 10 expanded assemblies were made.

Soma-Termik-Santrali-Logo
SOMA THERMAL POWER PLANT

Reactor maintenance of 3 different units was done.

İmbat-Madencilik-Logo
SOMA THERMAL POWER PLANT

Soma 600 Ton TH Rebar Straightening Presses Have Been Maintained.

Seydisehir

Steel Construction Minaret Manufacturing and Installation for Ketenli Mosque

Kayseri-Seker-Turhal-Logo
TURHAL SUGAR FACTORY

Special design steel construction modular staircase work was carried out for CEMS works.

İsdemir_Logo
İSKENDERUN IRON AND STEEL INC.

Improvement of POPs Batteries, Chimneys, Aircraft Warning Warning Lights and Lightning Rod System.

Erdallar-Gross
Erdallar Gross

Steel Construction Cattle Livestock Farm was manufactured and assembled.

karda-mühendislik-logo
Karda Engineering

Istanbul İSKİ Steel Construction and Sample Tracking Bridge Over Rivers Manufacturing and Installation work has been completed.

Turkseker-Logo
AFYON SUGAR FACTORYS INC.

Construction of a ladder to the boiler chimney in accordance with the Communiqué on Continuous Emission Measurement Systems.

serkan-medikal-logo
Serdar medical ınc.

Manufacturing and assembly of walkable roof with collapsible rails, hydraulic freight elevators, steel construction warehouses were made for Konya.

beyşehir-logo
Beyşehir

Beyşehir Hüyük Mosque Dome Manufacturing, thermal insulation and liquid insulation works.

Historic House restoration

The historical house belonging to Hacı Mehmet Ali Arslan, from Seydişehirli Gazneferler Dynasty, was restored.

PTT GÖLBAŞI SATELLITE GROUND STATION

Dish Assembly JAPANESE N.E.C. On behalf of the Company (EKIP)

CUMAOVASI AIRPORT WATCH TOWER

On Behalf of TEKFEN CONSTRUCTION (TEAM)

ANKARA DİKMEN DEPARTMENTS HOUSING

Central System Heating Building Chimney 100 Meters

YALIKOY DONE SAND FACILITIES

Stock Silos and Mill Assembly

İSTANBUL ALİBEYKÖY ÇOBANÇEŞME

500 Flats On Behalf of EKİNCİLER CONSTRUCTION (TEAM)

İSTANBUL BEYLİKDÜZÜ

5000 Flats Tunnel Formwork, Tower Crane on behalf of EKİNCİLER CONSTRUCTION. (TEAM)

SAYHA HOLDING KONYA

106 Duplex Ismil Spa House (BUİLDİNG SİTE)

ANTALYA AKSEKİ YARPUZDA

12 TRIPLEX VILLAS (COMMITMENT)

SEYDISEHIR SEYIDHARUN BUSINESS CENTER

Steel Conc. 30 M. Spacing Truss Column and Coating (SUBCONTRACTOR)

SEYDISEHIR ORGANIZED INDUSTRY

Şekerpen FAB. Almetal Aluminum FAB. Seytex Tekstil FAB. Call Model DEPOT. Gonenc Aluminum FAB. Annorm Aluminum FAB. Turker Aluminum FAB. Steel Construction Factory Buildings and coating work (COMMITMENT)

YALIHÜYÜK

FRUIT JUICE FACTORY (SUBCONTRACTING)

TINAZTEPE CAVES

Lighting, Walkway1500 MT. And Recreation Facilities (COMMITMENT)

ON THE ROAD TO KONYA AND ANTALYA

Summit Recreation Facilities (COMMITMENT)

ISTANBUL ERDOĞANLAR ALUMINUM INDUSTRY

ADDITIONAL STEEL FACILITY (SUBCONTRACTOR)

KONYA DEMRE FLOUR FACTORY

Steel Wheat Silos (Subcontractor)

TO MANY COMPANIES AROUND TURKEY

Tower Crane Assembly and Disassembly and Assembly of POTAİN, LİEBHERR, EDİLGRU, CADILLON, SIMMA, COMEDİL, ÇİMTAŞKAYZER, FMGRU, Brand Tower Cranes.

EÜAŞ TUNÇBİLEK THERMAL POWER PLANT

Coal Removal Belt Legs; Reinforced Concrete and Steel CONS. Reinforcement Process. (COMMITMENT)

EÜAŞ TUNÇBİLEK THERMAL POWER PLANT

Sandblasting and Epoxy Chemical Coating of Main Cooling Water Concrete and Steel Pipelines (COMMITMENT)

EÜAŞ TUNÇBİLEK THERMAL POWER PLANT

4th and 5th Units Floactor Pool Around Epoxy Chemical Repair Work and Construction Work of Heating Installation on the Carrier PASAVANT Road (TAAAHHÜT)

EÜAŞ TUNÇBİLEK THERMAL POWER PLANT

4 and 5 Units Chimney Repairs Complete (INSULATED - FIRE BRICK AND CONCRETE) Aircraft Warning Systems, Lightning Rod, Steel Const. Epoxy Repairs, Epoxy Painting. Turnkey Transaction with Materials (SUBCONTRACTOR)

TUTES

Cooling Tower CTP Coating

TUTES

Complete Maintenance and Repair of Flakulators (COMMITMENT)

TUTES

2 Pieces 120 MT Chimney Maintenance and Repair (COMMITMENT)

TUTES

Maintenance, Repair and Periodic Controls of All Cranes from 1 Ton to 150 Tons (COMMITMENT)

TUTES

Conversion of Coal Bunker Sliders to a Complete Hydraulic System (COMMITMENT)

TUTES

Sandblasting and Epoxy Coating of All Forced Drawing Pipes (COMMITMENT)

TUTES

Renovation of Boiler Roofs (COMMITMENT)

ÇATALAĞZI

ÇATALAĞZI TS Slag Crushing Press Manufacturing and Installation

SEYİTÖMER

SEYITÖMER TS Cooling Towers GRP Panel Replacement

SEYİTÖMER

Establishment of SEYITÖMER TS Chemical Water Treatment Plant

SEYİTÖMER

SEYITÖMER TS Turbine Crane Maintenance and Repair

SEYİTÖMER

SEYITÖMER TS Forced Drawing Pipes Sandblasting and Epoxy Coating Work

ORHANELİ

ORHANELİ TS Slag Trough Conversion of Hydraulic Auto Chain Tensioning and Boiler Pulling to Hydraulic System

ORHANELİ

ORHANELİ TS 10 TON 60 MT 2 Piece Crane Manufacturing and Installation

ORHANELİ

Conversion of ORHANELİ TS Boiler Burner Nozzles to Hydraulic System

ORHANELİ

Conversion of ORHANELİ TS Coal Bunker Bolts from Mechanical System to Electronic and Hydraulic System

SAMSUN POPLAR CEMENT FACTORY

All Rough Constructions and Turnkey Completed

ELAZIG SSYC CEMENT FACTORY

Coal Coils and Gas Channels; Reinforced Concrete, Steel, Heat Resistant Concrete and 3 Pieces 70 Meters Tunnel Construction (Subcontractor)

Sayer construction

Rail Missile Ramp Concrete Mold was manufactured.

SEYİTÖMER

Renovation of SEYITÖMER TS Boiler Roof and Facade Cladding

yozgat Cement Factory

Clinker Stock Silo Construction Completed.

Corum Cement Factory

Clinker Stock Silo Construction Completed.

ÇATES Electricity Generation Inc.

Steel Construction works for the Design, Project, Manufacturing and Assembly of the 1st and 2nd Unit Chimneys in accordance with SEÖS communiqué. Including Special Design Z ladder Manufacturing and Erection, Balcony reinforcement, Horizontal and Vertical Life Lines, Ground Crane with Guidance, SEÖS Platforms, Lighting, SEÖS Holes and Electrical works.

Misk machine

DFRP-6P Cooling Tower job for Iraq.

Fen Building and Construction

Sliding mold manufacturing works for the minaret and dome of the Istanbul Taksim Mosque Project.

ANKARA, İZMİR ,BURSA, İSTANBUL

Metrogros Markets; Steel CONS. Reinforcements, Reinforced Concrete Reinforcements with Epoxy and Chemicals AND Reinforcement of Prafabricated Columns with Steel Ropes. (COMMITMENT)

UKRAYNA ALÇEVSK KOK

Coal Coils and Gas Channels; Reinforced Concrete, Steel, Heat Resistant Concrete and 3 Pieces 70 Meters Tunnel Construction (Subcontractor)

Konya Ilgın BİKİLTAŞ

Turnkey cement plant, slip formwork and other construction works have been completed.

Cengiz Build

The CTS Chimney in Konya Seydişehir Eti Aluminum Facilities was completely painted and the steel construction ETİ lettering was manufactured and assembled.

Cengiz Build

15.000 TONS Silo Sliding mold works, electrolysis room distribution and modernization construction and steel construction manufacturing and assembly works in Konya Seydişehir Eti Aluminum Facilities have been completed.