Waste water treatment is one or more of the physical, chemical and biological treatment processes applied to restore some or all of the physical, chemical and bacteriological properties of water after various uses and to restore its natural physical, chemical and biological state. The treatment processes to be used also differ according to the quality of the waste water. Biological treatment device for the removal of organic substances dissolved in waste water as a result of bacteriological activities, Chemical waste water treatment plant for the removal of dissolved or suspended substances in waste water and which do not settle by gravity (gravitation), and for the removal of self-precipitating substances in waste water from the water. The use of physical water treatment plants is preferred. These processes can be used separately or by using them one after the other to form a treatment plant.
Waste water treatment is an expensive system and requires labor and investment to operate a system. For this reason, there are criteria to be considered when designing a wastewater treatment plant. When establishing a wastewater treatment plant, the treatment process, operating costs, equipment used in the construction of the treatment plant and production quality are the determining parameters for the treatment plant. Package treatment plants using septic tanks and vacuum trucks pay for themselves in a short time. Package wastewater treatment unit is a healthier solution than using a septic tank. The purified water from the package wastewater treatment system can be easily used in garden irrigation systems. Electricity consumption in the package wastewater treatment system is minimized thanks to the batch treatment process. Considering all these factors, a treatment plant should be built and the operation of the facility should be planned.
When establishing a wastewater treatment plant, great importance should be given to the selection of tools and equipment. It causes deterioration, separation and blockages in equipment using waste water or sewage. If quality and durable equipment is not selected, wear begins in a short time. This will prompt the need to renew your tools and equipment soon.