Category: Blog

What is Sliding Formwork and Climbing Formwork? What are the Application Areas?

Sliding mold; It is used in high buildings with reinforced concrete curtain walls. There are certain usage restrictions. It is a formwork system that enables high-rise buildings to be built...

by Yasin
Read More

MANUFACTURING METHOD PLAN OF SLIDING MOLD USED IN CONSTRUCTION OF SILO REINFORCED CONCRETE

1. GENERAL INFORMATION It is a formwork system that is manufactured specifically for the project by installing a formwork for structures such as reinforced concrete silos, chimneys, and clinker and...

by Yasin
Read More