Bridge & Viaduct Piers

Bridge & Viaduct
Piers

OUR PROCESS

Bridge and viaduct pier construction process

01

Pier Survey

Height, cross-section and river or road constraints are established during the bridge pier site survey.

02

Quotation

Slipform and post-tensioning are included in the bridge and viaduct package.

03

Structural Analysis

Wind, impact and vertical loads are incorporated into the pier cross-section design.

04

Detailing

Reinforcement, duct and formwork geometry are drawn up.

05

OHS

Work-at-height measures and the crane corridor are put in place.

06

Concreting

The bridge pier rises on the slipform while verticality is monitored.

07

Handover

Elevation and stressing records are handed over to the client.

IMPLEMENTATION

Our slipform approach
for bridge piers

01Engineering
Bridge & Viaduct Piers — Analysis

Analysis

Viaduct pier height and cross-section decide whether slipform or climbing formwork is used.

02Engineering
Bridge & Viaduct Piers — Engineering

Engineering

Post-tensioning ducts are incorporated into the bridge pier slipform drawings.

03Engineering
Bridge & Viaduct Piers — Bridge and viaduct pier construction

Bridge and viaduct pier construction

Verticality is measured at every lift, and a pier report is issued at handover.

ABOUT THE SERVICE

Slipform construction of
bridge and viaduct piers

Bridges and viaducts are major engineering structures that carry highways, railways and other transport routes across valleys, roads, rivers and other topographic obstacles. For the superstructure to be supported safely, reinforced-concrete load-bearing elements such as bridge piers and pylons must be built to the correct geometry, verticality and load-bearing capacity.

On tall viaducts in particular, reinforced-concrete piers can rise continuously for tens of metres, which makes the choice of formwork system one of the critical elements of the project. Whether the cross-section is constant or variable, the pier height, the wall thickness and any internal voids all play a key role in selecting the construction method.

Tall Bridge Piers

Tall bridge and viaduct piers with suitable geometry can be built using slipform technology. The system climbs hydraulically while concrete placement continues, so the reinforced-concrete pier is formed in a controlled, continuous rise. Worldwide, bridge pylons and tall bridge supports are among the established applications of slipforming, and Bygging-Uddemann's project history includes bridge pylon work in a number of countries.

In Rayf Teknik's slipform approach, the pier geometry is first examined in detail. If the cross-section changes with height, the formwork system must be prepared to accommodate that change. Special reinforced-concrete details inside the pier, such as voids or diaphragms, can also affect the work programme.

Verticality and Geometric Control

Survey control is critical on bridge and viaduct piers. Verticality monitoring must start at the lowest level and continue over the full height of the structure so that the superstructure connection points land precisely on the design coordinates.

In a slipform operation, concrete production, reinforcement fixing and the system's rate of rise are planned together. Because the setting characteristics of the concrete and weather conditions can affect daily progress, the site team must monitor the system continuously.

As bearings or pier cap beam connections will sit at the top of the pier, the related reinforcement and embedded items must be prepared at the correct levels. The smooth progress of subsequent construction stages depends on the tall reinforced-concrete pier being completed in line with the design not only in shape, but also in coordinates and elevation.

Rayf Teknik's experience in slipforming, tall reinforced-concrete structures and structural steel ensures that formwork engineering and site execution are considered together on bridge and viaduct projects.

The goal is not simply to raise the reinforced-concrete pier as quickly as possible. Keeping the structure within its design geometry, controlling concrete and reinforcement works, and correctly preparing the connections to the superstructure are the foundation of a successful bridge and viaduct project.

TECHNICAL SPECIFICATIONS

Bridge and viaduct pier technical specifications

On bridge and viaduct piers, verticality, cross-section and post-tensioning ducts are built into the slipform programme.

Specification Value
01 Scope Bridge & Viaduct Piers
02 Category Engineering
03 Site Bridge piers and viaducts
04 Execution Project-specific
05 OHS Per site programme
06 Handover With survey records and documentation
Bridge & Viaduct Piers

TECHNICAL ADVANTAGES

Why slipform for bridge piers?

On bridge piers, slipforming eliminates cold joints, while post-tensioning and verticality are managed together.

RAYF

01

Continuous Pier

Slipforming leaves no cold joints in the bridge pier.

Large-scale industrial facility working at night

TECHNICAL SUPPORT

Get expert support for your
bridge and viaduct projects.

Our technical team will contact you to arrange a site survey and quotation for your bridge or viaduct pier project.

Information & FAQ

Frequently asked questions about bridge and viaduct piers

Short answers on the scope, duration and handover of bridge and viaduct pier works.

What is a viaduct?

A viaduct is a long bridge that carries a road or railway across a valley, river bed, road or uneven terrain on a series of piers and consecutive spans. It typically consists of tall reinforced-concrete piers placed at regular intervals, with the deck resting on top of them. Because pier heights can reach several tens of metres, building each pier shaft with the correct geometry, verticality and load-bearing capacity is one of the most critical stages of the project.

For tall viaduct piers whose cross-section stays constant over a long height, slipforming allows the shaft to rise continuously and under control. Where the cross-section changes, climbing formwork or a hybrid solution is considered.

What is the difference between a bridge and a viaduct?

A bridge is the general term for any structure that carries a route over an obstacle such as a river, canal, road or railway. A viaduct is a type of bridge: it crosses a valley or a wide, deep stretch of ground on a series of piers with many spans between them. In short, every viaduct is a bridge, but not every bridge is a viaduct.

Bridges usually cross water or transport obstacles with one or a few spans, whereas viaducts carry a route across a long distance to overcome changes in level and are common on highway and railway projects. Because viaducts have many tall piers, slipform, climbing formwork and post-tensioning are key methods in pier construction.

Is slipform used for bridge and viaduct piers?

Slipforming is a suitable method for tall piers with a continuous cross-section. As the formwork rises hydraulically, concrete is placed without interruption, which reduces cold joints and makes verticality easier to monitor. The time savings are significant on pylons and tall pier shafts. Embedded anchorages and post-tensioning ducts are included in the drawings before the rise begins. The decision depends on height, changes in cross-section and space constraints on site.

Wind funnelled along a river bed or valley puts pier formwork under strain. Temporary bracing and working platforms are selected to suit these loads, and the slipform rate of rise is tied to wind limits.

When is climbing formwork chosen for a bridge pier?

Climbing formwork may be preferred for lower piers, piers with plain walls, or piers whose cross-section changes frequently. At each stage the formwork is struck and re-erected at the next level, and the concrete rises in lifts. Crane access and the anchor plan are at the heart of OHS planning. The choice between climbing formwork and slipform is made by comparing geometry and programme, and both methods can be discussed during the site survey.

Climbing formwork anchor holes affect the appearance of the wall. The patching mortar is defined in the specification, and on exposed piers this detail becomes an aesthetic requirement.

How is post-tensioning incorporated into a bridge pier?

Tendon ducts and anchorage pockets must be shown on the drawings before any concrete is placed. When the slipform is rising, these voids are formed at every level without exception. Stressing is applied in stages once the shaft has gained sufficient strength, and records include elongation and tension values. A misplaced duct undermines the pier's structural model.

If the duct profile is wrong, the tendon will either bind or sit loose. The slipform level and the duct level must match to the millimetre.

How is verticality monitored on a bridge pier?

Measurements are taken at every lift using a plumb line, total station or equivalent method. Since wind and sunlight can distort readings, the timing of each measurement is also planned. Small deviations are corrected by adjusting the formwork; if they are allowed to accumulate, the pier drifts outside its design section. All records go into the handover file. Verticality is the visible proof of slipform discipline.

Sunlight heats one face and causes it to expand, skewing the reading. Early-morning or shaded measurements are therefore preferred, and the report always states the time of each reading.