Istanbul Taksim Mosque

For finer craftsmanship

Minaret & Dome

Istanbul Taksim
Mosque

Minaret and dome construction at Taksim Mosque, Istanbul: a Ø 25.15 m main dome, two Ø 9.25 m domes and two 49 m minarets, for Sur Yapı and Fen Yapı.

49 m Minaret height
Ø 25.15 m Main dome
2 Minarets
Taksim / Istanbul Project location
Scroll down

Project Summary

Project Details

Key data for the minaret and dome construction at Taksim Mosque, Istanbul (2018).

Specification Value
01 Client Sur Yapı Endüstri San. ve Tic. A.Ş.
02 Contractor Fen Yapı İnş. Taah. Paz. San. ve Tic. Ltd. Şti.
03 Scope Minaret and dome construction
04 Main dome Ø 25.15 m, 11.80 m high
05 Secondary domes 2 no., Ø 9.25 m, 3.35 m high
06 Minarets 2 no., Ø 2.30 m, 49 m high
07 Site Taksim Square, Istanbul
Istanbul Taksim Mosque

From Our Portfolio

Related
Reference Projects

Selected CEMS, chimney, silo and steel projects delivered with the same engineering discipline.

Large-scale industrial facility operating at night

Project Support

Planning a project
like Istanbul Taksim Mosque?
Talk to our engineers.

From the initial site survey to final handover, our team supports your project at every stage. You can also reach us by email.

Questions & Answers

Frequently Asked Questions

Answers about our services, slipform technology, how it differs from climbing formwork and where it is used.

Does Rayf Teknik work in slipform, machinery and structural steel?

Yes. Rayf Teknik provides engineering, manufacturing and site services in all three areas.

What is a slipform system?

Slipform is a construction method for silos, chimneys and other tall reinforced-concrete structures. The formwork rises continuously as concrete is placed, which minimises the risk of cold joints.

What scope of work did this project cover?

Reinforced-concrete minarets and dome. Full specifications for Istanbul Taksim Mosque are listed in the Project Details section above.