Wall Formwork

Wall
Formwork

OUR PROCESS

Wall formwork process

01

Cross-Section Survey

Wall thickness, height, openings and site access are confirmed during the wall formwork site survey.

02

Quotation

Panel lengths, stiffeners and the tie-rod arrangement are set out in the quotation.

03

Design Calculations

Fresh concrete pressure and the number of panels and tie rods are assessed.

04

Fabrication

Panels are manufactured in the workshop and prepared for dispatch.

05

Erection

Both faces are erected opposite each other, and the thickness, axis and verticality are set.

06

Pouring & Striking

Once the concrete has gained strength, the formwork is opened and moved to the next wall or level.

07

Handover

Thickness, tie-rod arrangement and operating notes are handed over to the client.

EXECUTION

Our site approach to
wall formwork

01Construction Formwork
Wall Formwork — Analysis

Analysis

The wall thickness is set by the length of the tie rods between the two panels. Height and openings are taken from the wall cross-section, not from a fixed panel size.

02Construction Formwork
Wall Formwork — Engineering

Engineering

Stiffeners, walers and tie rods are designed for the fresh concrete pressure. If the tie rods are spaced too widely, the panel bulges.

03Construction Formwork
Wall Formwork — Wall formwork in practice

Wall formwork in practice

Erection, pouring and striking run as a single cycle. Site supervision can be provided for the first pour.

ABOUT THE SERVICE

Steel wall formwork
made to measure

Wall formwork is a steel formwork system that holds the thickness, verticality and surface flatness of a reinforced-concrete wall throughout the pour. Panels are erected facing each other on both faces of the wall, and the gap between them defines the wall thickness. Tie rods connecting the panels stop the fresh concrete from forcing the formwork apart, while external stiffeners and walers keep each panel in plane.

The formwork is manufactured in the workshop to suit the length and height of the wall. It is erected on site, struck once the concrete has reached the required strength and then re-erected on the next wall or at the next level. The aim is not just to shape the concrete, but to maintain the same thickness and the same verticality with every pour.

Panels, Stiffeners and Tie Rods Work Together

In wall formwork, the face plate does not carry the pressure on its own. Stiffener spacing and the number of walers and tie rods are determined by the fresh concrete pressure, the pour height and the wall thickness. If the tie rods are spaced too widely, the panel bulges, the wall thickness goes out of tolerance and the surface becomes wavy. For this reason, tie-hole positions and the tightening sequence are drawn up before fabrication.

Door and window openings, service penetrations and embedded plates are put in place before the formwork is closed. Cutting panels afterwards both extends the programme and reduces rigidity. Reinforcement and starter bars are also checked before the formwork is closed. On tall walls, once the lower lift has gained strength, the formwork is struck and raised to the next level. This cycle can be arranged so that it does not clash with a climbing formwork set-up.

Rayf Teknik treats wall formwork not as a fixed panel size, but as a fabrication developed around the wall thickness and pour height. The workshop images show stiffened steel panels and the tie-rod arrangement. The same panels can be reused on the next wall if the thickness matches. If the thickness changes, the spacers and tie-rod lengths are renewed, while a suitable frame can be retained.

During erection, the axis, thickness and verticality are set before the first pour. As the concrete is placed, vibration must not loosen the tie rods, and the concrete consistency must not generate more pressure than the panel design allows for. The formwork is never struck before the concrete has gained enough strength to hold its own shape. Striking too early makes the wall bulge; striking too late lets the panel bond to the concrete.

Whether the formwork is purchased or deployed on a site contract, site supervision can be provided for the initial erection and the first pour. At handover, the thickness, tie-rod arrangement and operating notes are documented. In this way, wall formwork is not a one-off sheet-metal job but a production tool that is re-erected time after time, with a dimensional record kept throughout.

TECHNICAL SPECIFICATIONS

Wall formwork: technical overview

Wall formwork is manufactured to suit the wall thickness, pour height and concrete pressure. The rows below show a typical application framework.

Specification Value
01 System Steel wall formwork
02 Erection Opposing panels
03 Connection Tie rods and stiffeners
04 Dimensions Wall thickness and pour height
05 Use Can be re-erected repeatedly
06 Support Fabrication, shipping and site supervision
Wall Formwork

TECHNICAL ADVANTAGES

Why steel wall formwork?

Wall formwork brings thickness control, pressure resistance and repeat erection together in one solution. The advantages are set out point by point.

RAYF

01

Opposing Panels

Formwork on both faces fixes the wall thickness with tie rods.

Large-scale industrial facility working at night

TECHNICAL SUPPORT

Get support for your
wall formwork project.

Our technical team will contact you to arrange a site survey and quotation for your wall formwork.

Information & FAQ

Wall formwork FAQs

Short answers on the scope, timescales and handover of wall formwork.

What is wall formwork?

Wall formwork is a steel formwork system that holds the thickness and verticality of a reinforced-concrete wall throughout the pour. Panels are erected facing each other on both faces of the wall. Tie rods stop the panels from spreading apart, while stiffeners keep the face in plane. The formwork is fabricated in the workshop to the wall dimensions, erected on site and struck once the concrete has gained strength. The same panels can be reused on the next wall.

If the tie rods are spaced too widely, the wall bulges and the thickness goes out of tolerance. Tie holes are drilled exactly as shown on the drawing; leaving out “just one” on site is not an option.

How is wall formwork erected?

Panels are positioned on both faces of the wall, connected with tie rods, and the walers are tightened. Thickness, axis and verticality are measured before any concrete is placed. Door and window formers and embedded plates are fitted at this stage. On tall walls, once the lower lift has gained strength, the formwork is struck and re-erected at the next level. The first pour is monitored as a trial that shows the panels have seated correctly.

Cutting a panel after the formwork has been closed to create a forgotten opening reduces its rigidity. Any missing item is completed before the pour.

Can the same wall formwork be used for a different wall thickness?

If the thickness is the same, the panels are simply re-erected on the next wall. If the thickness changes, the tie-rod lengths and spacers are renewed, while a suitable frame can be retained. Forcing the formwork to make up even a small difference crushes or thins the wall, so this limit is set during the site survey. During the initial erection, the site supervisor checks the tightening sequence and verticality together with the site team.

Cutting down an old tie rod to shorten it weakens the thread and the nut. A new thickness means a new tie-rod length. The record shows which panel went to which wall.

When is wall formwork struck?

The formwork is never struck before the concrete has gained enough strength to hold its own shape. Opening it too early makes the wall bulge and the surface turn wavy. Striking it too late lets the panel bond to the concrete. Timing is monitored on site according to the concrete class, the weather and the pour height. Once struck, the panel is cleaned and closed with the same tie-rod arrangement at the next erection.

Striking time is governed by concrete strength, not by the clock. In cold weather, the same number of hours is too early. If the surface still yields to a fingertip, the formwork stays in place.