Algeria Nine-Cell Grain Silos

For safer storage

Silo

Algeria Nine-Cell
Grain Silos

Slipform construction of three nine-cell reinforced-concrete grain silo groups in Algeria for Aslan Yapı: Ø 12 m, 45.80 m high, 15,000 t per silo.

15,000 t Capacity
Ø 12 m Diameter
45.80 m Height
Algeria Project location
Scroll down

Project Summary

Project Details

Grain silos in Algeria, 2026. All dimensions are taken from the project records.

Specification Value
01 Client Aslan Yapı Tic. A.Ş.
02 Scope Three nine-cell grain silo groups
03 Structure Reinforced-concrete silo
04 Capacity 15,000 t
05 Diameter Ø 12 m
06 Height 45.80 m
07 Site Algeria
08 Additional scope Hopper formwork, slipform staircase, mezzanine slab formwork, site supervision
Algeria Nine-Cell Grain Silos

From Our Portfolio

Related
Reference Projects

Selected CEMS, chimney, silo and steel projects delivered with the same engineering discipline.

Large-scale industrial facility operating at night

Project Support

Planning a project
like Algeria Nine-Cell Grain Silos?
Talk to our engineers.

From the initial site survey to final handover, our team supports your project at every stage. You can also reach us by email.

Questions & Answers

Frequently Asked Questions

Answers about our services, slipform technology, how it differs from climbing formwork and where it is used.

Does Rayf Teknik work in slipform, machinery and structural steel?

Yes. Rayf Teknik provides engineering, manufacturing and site services in all three areas.

What is a slipform system?

Slipform is a construction method for silos, chimneys and other tall reinforced-concrete structures. The formwork rises continuously as concrete is placed, which minimises the risk of cold joints.

What scope of work did this project cover?

Slipform construction of three nine-cell reinforced-concrete grain silos. Full specifications for Algeria Nine-Cell Grain Silos are listed in the Project Details section above.