Ilgın Cement Plant Silos

For faster vertical progress

Slipform

Ilgın Cement
Plant Silos

Slipform construction of reinforced-concrete silos at the cement plant in Ilgın, Konya, carried out by Rayf Teknik between 2016 and 2017.

Ilgın Site
Slipform Method
2016–2017 Years
Ilgın / Konya Project location
Scroll down

Project Summary

Project Details

Key data for the slipform silo works at the Ilgın cement plant.

Specification Value
01 Site Ilgın / Konya
02 Facility Cement plant
03 Method Slipform
04 Year 2016–2017
05 Structure Reinforced-concrete silo
Ilgın Cement Plant Silos

From Our Portfolio

Related
Reference Projects

Selected CEMS, chimney, silo and steel projects delivered with the same engineering discipline.

Large-scale industrial facility operating at night

Project Support

Planning a project
like Ilgın Cement Plant Silos?
Talk to our engineers.

From the initial site survey to final handover, our team supports your project at every stage. You can also reach us by email.

Questions & Answers

Frequently Asked Questions

Answers about our services, slipform technology, how it differs from climbing formwork and where it is used.

Does Rayf Teknik work in slipform, machinery and structural steel?

Yes. Rayf Teknik provides engineering, manufacturing and site services in all three areas.

What is a slipform system?

Slipform is a construction method for silos, chimneys and other tall reinforced-concrete structures. The formwork rises continuously as concrete is placed, which minimises the risk of cold joints.

What scope of work did this project cover?

Slipform works at the Ilgın cement plant. Full specifications for Ilgın Cement Plant Silos are listed in the Project Details section above.