Section Survey
Wall geometry determines whether climbing formwork or slipform is used.
OUR PROCESS
Wall geometry determines whether climbing formwork or slipform is used.
Lift heights, anchors and crane requirements are included in the climbing formwork package.
Anchor and formwork loads are calculated.
The first lift is assembled on the foundation.
The crane corridor and guardrails are prepared.
Once the concrete has set, the formwork is struck and re-erected at the next level.
Elevation records are handed over to the operator.
IMPLEMENTATION
Climbing formwork suits plain walls of moderate height, while slipform comes to the fore for silos and chimneys.
Anchors, lift height and crane sequencing are resolved in a single plan.
Striking and re-erection at every lift are carried out under OHS control, and an elevation report is issued at handover.
ABOUT THE SERVICE
A climbing formwork system is a controlled formwork method that advances tall reinforced-concrete structures upwards in defined concrete lifts. Depending on project requirements, it can be applied to bridge piers, viaduct supports, tall wall structures, industrial towers and reinforced-concrete elements of many different geometries. Once the structure has been completed up to the defined pour height, the formwork is moved to the next level, and the same work cycle is repeated up to the top of the structure.
Although climbing formwork and slipform are often confused, they work on different principles. With slipform, concreting and the rise of the formwork are carried out as a more continuous production operation, whereas climbing formwork advances through defined concrete pour stages. The choice of method should therefore be based on an assessment of the structure's geometry, height, concreting programme, expected surface finish, access conditions and the project's technical details.
Rayf Teknik treats climbing formwork not as an off-the-shelf product but as engineered equipment that must be planned around the project's reinforced-concrete geometry. Panel dimensions, working platforms, anchor points, the lifting system and personnel access are all assessed before work begins. If the geometry of the structure changes with height, the formwork system must be able to adapt to that change.
Because the working level on high-rise projects is constantly changing, occupational health and safety takes on particular importance. Working platforms, guardrails, access points and formwork connections must all be advanced in a controlled way. At higher elevations especially, wind effects, material handling and the organisation of working areas should be treated as an integral part of the project programme.
On some projects climbing formwork is used on its own, while on others a hybrid approach can be planned, combining it with a slipform system in different parts of the structure. For example, slipform may be the better option for tall reinforced-concrete sections whose cross-section stays constant over a long height, while climbing formwork may be preferred for sections with geometric transitions or special concrete pour stages. In this way, the project is not tied to a single formwork method, and each section can be built with the most suitable technique.
Monitoring concrete strength is also important with climbing formwork. Before the formwork can be raised to the next level, the previous pour must have gained enough strength to carry the loads imposed by the system safely. For this reason, the concreting programme and formwork movements are planned in close coordination.
Drawing on its experience in industrial and tall reinforced-concrete structures, Rayf Teknik can evaluate and apply climbing formwork and slipform systems to suit project conditions. The aim is not simply to raise the structure, but to deliver a reinforced-concrete structure that meets the project's technical requirements by keeping dimensions, verticality, work safety and construction quality under control at every pour stage.
TECHNICAL SPECIFICATIONS
Climbing formwork is set up around lift height, anchorage and the crane plan. How it differs from slipform is clarified during the site survey.
TECHNICAL ADVANTAGES
Climbing formwork delivers staged construction for plain-walled structures of moderate height. For circular silos, slipform remains the first choice.
Climbing formwork raises the wall level by level.
01
Climbing formwork raises the wall level by level.
SERVICE GALLERY

TECHNICAL SUPPORT
Our technical team will contact you to arrange a site survey and quotation for your climbing formwork project.
Information & FAQ
Short answers on the scope, duration and handover of climbing formwork projects.
Climbing formwork is a method in which concrete is placed in a defined lift and, once it has gained strength, the formwork is moved up to the next level on anchors. There is no continuous movement as with slipform; the work progresses in stages. In terms of control and surface quality, it is well suited to plain-walled structures of moderate height. Cranage, guardrails and anchor removal are central to the OHS plan. The decision is based on geometry and height.
A climbing formwork surface may show a joint line at each lift; the specification states whether this line is accepted or must be eliminated. This is where it differs from the continuous surface produced by slipform.
With slipform, the system is erected once and rises continuously on hydraulic jacks, which lowers the risk of cold joints. With climbing formwork, the formwork is struck and re-erected at every lift, creating construction joints between pours. For circular silos and chimneys, slipform is usually the first choice. For plain walls and stepped architectural openings, climbing formwork can be more flexible. The choice depends on programme, OHS and changes in cross-section.
If the cross-section changes every ten metres, the slipform panels need constant modification and the economics are reversed. Climbing formwork adapts to such changes more easily.
Typical applications include low- and medium-height plain walls, some bridge piers and minaret shafts. It is also chosen where the cross-section changes frequently and slipform becomes less economical. Crane access is essential. Reinforcement and anchors are reinstalled at every lift. Surface tolerances and joint details are written into the specification.
If the wall edge breaks when an anchor is removed, the repair work grows. The striking sequence is documented, and striking in high winds is prohibited.
Lifting formwork to height increases the risks associated with crane load swing, falls and anchor removal. Access corridors, guardrails, lifelines and the striking sequence are covered in a dedicated plan. Work stops once the wind limit is exceeded, and platform loads are never left out of the calculations. At handover, sealing the anchor holes is also part of the safety work.
A swinging crane rope is the most common cause of accidents. Banksman and radio protocols are part of every climbing formwork shift. “We’re used to it” is never a substitute for a plan.