Bozüyük Glass Plant Chimney

For stronger structures

Industrial Chimney

Bozüyük Glass
Plant Chimney

Turnkey 100 m reinforced-concrete chimney for Park Cam's phase 2 glass plant in Bozüyük, Ø 9.70–5.80 m, with lining, insulation, steelwork and aviation lights.

100 m Height
Ø 9.70 m Max. diameter
2015 Year
Bozüyük / Eskişehir Project location
Scroll down

Project Summary

Project Details

Key data for the 2015 Bozüyük chimney. The shell diameter ranges from Ø 9.70 m to Ø 5.80 m.

Specification Value
01 Client Park Cam San. Tic. A.Ş.
02 Scope Phase 2 reinforced-concrete chimney construction
03 Structure Reinforced-concrete chimney
04 Facility Glass plant
05 Diameter Ø 9.70 m – Ø 5.80 m
06 Height 100 m
07 Site Bozüyük / Eskişehir
08 Additional scope Aviation warning lights, lightning protection, brick lining, insulation, steelwork, painting, cast-iron cap
Bozüyük Glass Plant Chimney

From Our Portfolio

Related
Reference Projects

Selected CEMS, chimney, silo and steel projects delivered with the same engineering discipline.

Large-scale industrial facility operating at night

Project Support

Planning a project
like Bozüyük Glass Plant Chimney?
Talk to our engineers.

From the initial site survey to final handover, our team supports your project at every stage. You can also reach us by email.

Questions & Answers

Frequently Asked Questions

Answers about our services, slipform technology, how it differs from climbing formwork and where it is used.

Does Rayf Teknik work in slipform, machinery and structural steel?

Yes. Rayf Teknik provides engineering, manufacturing and site services in all three areas.

What is a slipform system?

Slipform is a construction method for silos, chimneys and other tall reinforced-concrete structures. The formwork rises continuously as concrete is placed, which minimises the risk of cold joints.

What scope of work did this project cover?

Turnkey reinforced-concrete chimney. Full specifications for Bozüyük Glass Plant Chimney are listed in the Project Details section above.