Istanbul Silivri Boğaziçi Çimento Silos

For safer storage

Silo

Silivri Boğaziçi
Çimento Silos

Nine reinforced-concrete silos at the Boğaziçi Çimento grinding plant in Silivri for Cengiz İnşaat: a Ø 37 m clinker silo plus additive and cement silos.

9 silos Quantity
Ø 37 m Clinker silo
26.50 m Cement silos
Silivri / Istanbul Project location
Scroll down

Project Summary

Project Details

Nine reinforced-concrete silos at the Boğaziçi Çimento grinding plant site. Clinker, additive and cement silos are listed separately with their own dimensions.

Specification Value
01 Client Cengiz İnşaat San. ve Tic. A.Ş.
02 Site Boğaziçi Çimento grinding plant project, Silivri
03 Structure Reinforced-concrete silo
04 Quantity 9 silos in total
05 Clinker silo 1 no., Ø 37 m, 11.50 m high
06 Additive silos 4 no., Ø 13 m, 26.50 m high
07 Cement silos 4 no., Ø 13 m, 26.50 m high
08 Additional scope Technical support, consultancy and embedded steel installation
Istanbul Silivri Boğaziçi Çimento Silos

From Our Portfolio

Related
Reference Projects

Selected CEMS, chimney, silo and steel projects delivered with the same engineering discipline.

Large-scale industrial facility operating at night

Project Support

Planning a project
like Istanbul Silivri Boğaziçi Çimento Silos?
Talk to our engineers.

From the initial site survey to final handover, our team supports your project at every stage. You can also reach us by email.

Questions & Answers

Frequently Asked Questions

Answers about our services, slipform technology, how it differs from climbing formwork and where it is used.

Does Rayf Teknik work in slipform, machinery and structural steel?

Yes. Rayf Teknik provides engineering, manufacturing and site services in all three areas.

What is a slipform system?

Slipform is a construction method for silos, chimneys and other tall reinforced-concrete structures. The formwork rises continuously as concrete is placed, which minimises the risk of cold joints.

What scope of work did this project cover?

Slipform construction of nine reinforced-concrete silos. Full specifications for Istanbul Silivri Boğaziçi Çimento Silos are listed in the Project Details section above.