For stiffer spans
Post-Tensioning
Post-Tensioning
Works
Post-tensioning works carried out in 2021–2022, covering anchorage plates, tendon ducts and grout hose connections for reinforced-concrete structures.
Site Gallery
Project Gallery












Project Summary
Project Details
Key data for our post-tensioning works.
From Our Portfolio
Related
Reference Projects
Selected CEMS, chimney, silo and steel projects delivered with the same engineering discipline.

Project Support
Planning a project
like Post-Tensioning Works?
Talk to our engineers.
From the initial site survey to final handover, our team supports your project at every stage. You can also reach us by email.
Questions & Answers
Frequently Asked Questions
Answers about our services, slipform technology, how it differs from climbing formwork and where it is used.
Does Rayf Teknik work in slipform, machinery and structural steel?
Yes. Rayf Teknik provides engineering, manufacturing and site services in all three areas.
What is a slipform system?
Slipform is a construction method for silos, chimneys and other tall reinforced-concrete structures. The formwork rises continuously as concrete is placed, which minimises the risk of cold joints.
What scope of work did this project cover?
Post-tensioning anchorage and duct works. Full specifications for Post-Tensioning Works are listed in the Project Details section above.