Seydişehir Eti Alüminyum Chimney

For stronger structures

Industrial Chimney

Seydişehir Eti
Alüminyum Chimney

Industrial chimney works and associated site operations carried out in 2017 at the Eti Alüminyum aluminium plant in Seydişehir, Konya, Türkiye.

Chimney Structure
2017 Year
Seydişehir Site
Seydişehir / Konya Project location
Scroll down

Project Summary

Project Details

Key data for the chimney works at the Eti Alüminyum plant in Seydişehir.

Specification Value
01 Facility Eti Alüminyum
02 Site Seydişehir / Konya
03 Structure Industrial chimney
04 Year 2017
05 Scope Chimney works and site operations
Seydişehir Eti Alüminyum Chimney

From Our Portfolio

Related
Reference Projects

Selected CEMS, chimney, silo and steel projects delivered with the same engineering discipline.

Large-scale industrial facility operating at night

Project Support

Planning a project
like Seydişehir Eti Alüminyum Chimney?
Talk to our engineers.

From the initial site survey to final handover, our team supports your project at every stage. You can also reach us by email.

Questions & Answers

Frequently Asked Questions

Answers about our services, slipform technology, how it differs from climbing formwork and where it is used.

Does Rayf Teknik work in slipform, machinery and structural steel?

Yes. Rayf Teknik provides engineering, manufacturing and site services in all three areas.

What is a slipform system?

Slipform is a construction method for silos, chimneys and other tall reinforced-concrete structures. The formwork rises continuously as concrete is placed, which minimises the risk of cold joints.

What scope of work did this project cover?

Eti Alüminyum industrial chimney. Full specifications for Seydişehir Eti Alüminyum Chimney are listed in the Project Details section above.