Seydişehir Eti Alüminyum Stock Silo

For safer storage

Silo

Seydişehir Eti Alüminyum
Stock Silo

15,000 t reinforced-concrete stock silo, Ø 25 m and 46.20 m high, built for Cengiz İnşaat at Eti Alüminyum Seydişehir, with steelwork, primer and paint.

15,000 t Capacity
Ø 25 m Diameter
46.20 m Height
Seydişehir / Konya Project location
Scroll down

Project Summary

Project Details

Key data for the 2017 Seydişehir stock silo.

Specification Value
01 Client Cengiz İnşaat San. ve Tic. A.Ş.
02 Scope Electrolysis plant distribution and modernisation
03 Structure Reinforced-concrete silo
04 Capacity 15,000 t
05 Diameter Ø 25 m
06 Height 46.20 m
07 Site Eti Alüminyum, Seydişehir
08 Additional scope Steel fabrication and erection; sealer, primer and paint
Seydişehir Eti Alüminyum Stock Silo

From Our Portfolio

Related
Reference Projects

Selected CEMS, chimney, silo and steel projects delivered with the same engineering discipline.

Large-scale industrial facility operating at night

Project Support

Planning a project
like Seydişehir Eti Alüminyum Stock Silo?
Talk to our engineers.

From the initial site survey to final handover, our team supports your project at every stage. You can also reach us by email.

Questions & Answers

Frequently Asked Questions

Answers about our services, slipform technology, how it differs from climbing formwork and where it is used.

Does Rayf Teknik work in slipform, machinery and structural steel?

Yes. Rayf Teknik provides engineering, manufacturing and site services in all three areas.

What is a slipform system?

Slipform is a construction method for silos, chimneys and other tall reinforced-concrete structures. The formwork rises continuously as concrete is placed, which minimises the risk of cold joints.

What scope of work did this project cover?

15,000 t reinforced-concrete stock silo. Full specifications for Seydişehir Eti Alüminyum Stock Silo are listed in the Project Details section above.