Turkmenistan Slipform System

For faster site set-up

Slipform

Turkmenistan
Slipform System

Slipform system and equipment manufactured in the Rayf Teknik workshop in 2021 for a project in Turkmenistan, including panels, hydraulics and platforms.

Slipform System
2021 Year
Manufacture Work
Turkmenistan Project location
Scroll down

Project Summary

Project Details

Key data for the slipform system manufactured for Turkmenistan.

Specification Value
01 Scope Slipform manufacture
02 Site Turkmenistan
03 Year 2021
04 Manufactured at Rayf Teknik workshop
Turkmenistan Slipform System

From Our Portfolio

Related
Reference Projects

Selected CEMS, chimney, silo and steel projects delivered with the same engineering discipline.

Large-scale industrial facility operating at night

Project Support

Planning a project
like Turkmenistan Slipform System?
Talk to our engineers.

From the initial site survey to final handover, our team supports your project at every stage. You can also reach us by email.

Questions & Answers

Frequently Asked Questions

Answers about our services, slipform technology, how it differs from climbing formwork and where it is used.

Does Rayf Teknik work in slipform, machinery and structural steel?

Yes. Rayf Teknik provides engineering, manufacturing and site services in all three areas.

What is a slipform system?

Slipform is a construction method for silos, chimneys and other tall reinforced-concrete structures. The formwork rises continuously as concrete is placed, which minimises the risk of cold joints.

What scope of work did this project cover?

Slipform system manufacture. Full specifications for Turkmenistan Slipform System are listed in the Project Details section above.