Uzbekistan Metro Tunnel Formwork

For faster line progress

Culvert Formwork

Uzbekistan Metro
Tunnel Formwork

Hydraulic cut-and-cover formwork for XVAV Yapı on Tashkent's twin metro tunnel: 12 m a day over 8 km, 7.5 m high and 13 m wide, with site supervision.

8 km Line length
13 m Width
12 m/day Progress
Tashkent / Uzbekistan Project location
Scroll down

Project Summary

Project Details

Hydraulic cut-and-cover culvert formwork for the twin metro tunnel in Tashkent.

Specification Value
01 Client XVAV Yapı San. ve Tic. A.Ş.
02 Scope Hydraulic cut-and-cover formwork for a twin metro tunnel
03 Structure Reinforced-concrete tunnel
04 Progress 12 m per day
05 Total length 8 km
06 Height 7.5 m
07 Width 13 m
08 Site Tashkent / Uzbekistan
09 Additional scope Site supervision and technical consultancy
Uzbekistan Metro Tunnel Formwork

From Our Portfolio

Related
Reference Projects

Selected CEMS, chimney, silo and steel projects delivered with the same engineering discipline.

Large-scale industrial facility operating at night

Project Support

Planning a project
like Uzbekistan Metro Tunnel Formwork?
Talk to our engineers.

From the initial site survey to final handover, our team supports your project at every stage. You can also reach us by email.

Questions & Answers

Frequently Asked Questions

Answers about our services, slipform technology, how it differs from climbing formwork and where it is used.

Does Rayf Teknik work in slipform, machinery and structural steel?

Yes. Rayf Teknik provides engineering, manufacturing and site services in all three areas.

What is a slipform system?

Slipform is a construction method for silos, chimneys and other tall reinforced-concrete structures. The formwork rises continuously as concrete is placed, which minimises the risk of cold joints.

What scope of work did this project cover?

Hydraulic culvert formwork for a twin metro tunnel. Full specifications for Uzbekistan Metro Tunnel Formwork are listed in the Project Details section above.