Uzbekistan Overhead Crane

For more controlled lifting

Overhead Crane

Uzbekistan
Overhead Crane

Overhead travelling crane for Olmaliq G‘ishtchisi in Uzbekistan: 10 t and 16 t trolleys, 20 m span, 80 m bay, installed on site by our specialists.

10–16 t Capacity
20 m Span
80 m Bay length
Tashkent / Uzbekistan Project location
Scroll down

Project Summary

Project Details

Key data for the overhead crane exported to Uzbekistan.

Specification Value
01 Client Olmaliq G‘ishtchisi
02 Scope Overhead travelling crane
03 Structure Overhead crane
04 Capacity 10 t and 16 t
05 Bridge span 20 m
06 Bay length 80 m
07 Equipment Hoist trolleys, rails, busbar, current collector, cabling
08 Site Tashkent / Uzbekistan
09 Additional scope Specialist installation personnel and technical support
Uzbekistan Overhead Crane

From Our Portfolio

Related
Reference Projects

Selected CEMS, chimney, silo and steel projects delivered with the same engineering discipline.

Large-scale industrial facility operating at night

Project Support

Planning a project
like Uzbekistan Overhead Crane?
Talk to our engineers.

From the initial site survey to final handover, our team supports your project at every stage. You can also reach us by email.

Questions & Answers

Frequently Asked Questions

Answers about our services, slipform technology, how it differs from climbing formwork and where it is used.

Does Rayf Teknik work in slipform, machinery and structural steel?

Yes. Rayf Teknik provides engineering, manufacturing and site services in all three areas.

What is a slipform system?

Slipform is a construction method for silos, chimneys and other tall reinforced-concrete structures. The formwork rises continuously as concrete is placed, which minimises the risk of cold joints.

What scope of work did this project cover?

10 t and 16 t overhead travelling crane. Full specifications for Uzbekistan Overhead Crane are listed in the Project Details section above.